Inventus Mining Reports Positive Results From Its 80-Hole Drill Program at the Pardo Gold Project; Confirms Continuity of Shallow Gold Mineralization and Outlines Next Steps

/EIN News/ -- TORONTO, March 25, 2025 (GLOBE NEWSWIRE) -- Inventus Mining Corp. (TSXV: IVS) (“Inventus” or the “Company”) is pleased to announce results from its 80-hole Phase 1 Resource Drill Program at the 100%-owned Pardo Gold Project located 65 km east of Sudbury, Ontario.

The program was designed to sample areas of shallow, flat-lying gold mineralization to establish continuity and consistency of gold grades. Results from the program have successfully confirmed continuity of the gold mineralization within 18 metres of surface which remains open for expansion. Highlights from all 80 drill holes are presented in Table 1, with drill hole locations and corresponding gold grades illustrated in Figure 1. The Phase 1 drill results have clearly demonstrated the project’s merits highlighting the potential for rapid development of a low-cost, surface mining operation.

Advancing Toward Resource Definition and Bulk Sampling

The results from the Phase 1 Resource Drill Program have provided a foundation and methodology to further define the gold mineralization and develop a mineral resource estimate on the property. The current drilling has defined the 2-metres-thick mineralized unit over an area of approximately 400 by 550 metres in size, which remains open for further expansion (Figure 2). A follow-up phase 2 drill program is planned and will focus on expanding the mineralization prior to a mineral resource estimate. The company is also assessing the opportunity to utilize its 50,000-tonne bulk sample permit on the property. As part of the Phase 1 drilling, the permitted bulk sample area was tested to demonstrate the gold grade of a future bulk sample site (Figure 3).

Ontario Junior Exploration Program (OJEP) Grant

Inventus is pleased to report that it has received payment of $200,000 from the Ontario Ministry of Mines as part of the OJEP grant. The grant provided funding for 50% of exploration expenditures that were incurred during the 80-hole Phase 1 Resource Drill Program.

“The final results from our Phase 1 drill program have confirmed that the gold-bearing reef at Pardo is continuous, remains open for expansion, and can be defined with large diametre core,” stated Wesley Whymark, President and Head of Exploration. “These results strongly reinforce our goal of developing a low-capital, high-margin surface mining operation. With year-round access and proximity to Sudbury’s world-class mining infrastructure, Pardo presents a compelling opportunity for near-term development. Moving forward, we plan to pursue additional bulk sampling alongside a Phase 2 resource drill program. Additional bulk sampling will demonstrate more confidence of the gold grade and project economics, while the phase 2 drilling will define a larger area of gold mineralization and set the stage for a maiden resource estimate.”

For further information visit www.inventusmining.com, or contact:

Mr. Wesley Whymark
President and Head of Exploration
Inventus Mining Corp.
E-mail: wesley@inventusmining.com
Phone: 705-822-3005

About Inventus Mining Corp.

Inventus is a mineral exploration and development company focused on the world-class mining district of Sudbury, Ontario. Our principal assets are a 100% interest in the Pardo Paleoplacer Gold Project and the Sudbury 2.0 Critical Mineral Project located northeast of Sudbury. Pardo is the first important paleoplacer gold discovery found in North America. Inventus has approximately 183 million common shares outstanding.

Qualified Person

The Qualified Person responsible for the technical content of this news release is Inventus’ President and Head of Exploration, Wesley Whymark, P.Geo., who has reviewed and approved the technical disclosure in this news release on behalf of the Company.

Technical Information

Drill core samples collected by Inventus and described in this news release were subject to a variety of QA/QC protocols. Drill core was placed in core boxes by the drill crew contracted by the Company. Core was then transported by Inventus personnel to a secure processing facility in Sudbury, Ontario. The core was then reviewed with core metreage blocks checked to verify core integrity, recovery and geologically logged with samples marked. Core samples were then photographed and inserted into a clean plastic bag with a sample tag. Certified reference materials were inserted into the sample stream at a rate of no less than 10%. Samples were then transported in secure sealed bags with security tags for preparation and assay by MSA Labs in Timmins and Val-d’Or, both certified labs with AC89, IAS accreditation and compliance with ISO/IEC standard 17025:2017. All samples reported were crushed in their entirety to 70% passing 2 mm. Three different subsample preparation methods were conducted on the samples due to the large size of the samples (PQ Size Core).

  1. One (1) 300- to 500-g subsample was riffle split and placed into a jar for gold analysis by photon assay.
  2. Two (2) 300- to 500-g subsamples were riffle split and placed into jars for gold analysis by photon assay in duplicate.
  3. Two (2) samples comprising 2kg each were riffle split and pulverized to 80% 75 microns (-200 mesh) and one (1) 300- to 500-g subsample was riffle split and taken from each and placed into a jar for gold analysis by photon assay.

Samples above and below the targeted mineralized zone were assayed using method 1 above while the targeted mineralized zone was assayed using method 2 and 3. Final assays were then checked by Agat Laboratories in Thunderbay, Ontario. Check assays were conducted on approximately 5% of the samples using fire assays and comprised a series of low, medium and high-grade assays to independently verify accuracy of the results.

Forward-Looking Statements

This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “if”, “yet”, “potential”, “undetermined”, “objective”, or “plan”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to the failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public documents filed on SEDAR+. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Fig 1

Figure 1. Plan map illustrating gold grade (gpt Au) of the approximately 2-metre-thick gold-bearing reef at the Pardo Gold Project.

Fig 2

Figure 2. Plan map illustrating the area of currently drilled gold mineralization and the regional extent of the targeted host geology open for expansion.

Fig 3

Figure 3. Plan map illustrating permitted bulk sample location and gold grade (gpt Au) of the approximately 2-metre-thick gold-bearing reef at the Pardo Gold Project.

Table 1. Drilling Assay Highlights.

Drill Hole From
(metres)
To
(metres)
Interval1
(metres)
Gold Grade
(gpt)
PD-24-01 3.53 5.27 1.74 0.8
PD-24-02 5.03 8.14 3.11 1.3
Including 5.03 6.50 1.47 2.3
Including 5.49 5.99 0.50 4.2
PD-24-03 6.31 7.73 1.42 1.5
PD-24-04 9.00 11.21 2.21 1.8
Including 9.82 10.32 0.50 5.8
PD-24-05 7.67 10.10 2.43 4.6
Including 9.16 10.10 0.94 11.5
Including 9.64 10.10 0.46 21.2
PD-24-06 8.65 10.55 1.90 0.8
Including 9.60 10.10 0.50 2.0
PD-24-07 7.27 7.95 0.68 0.2
PD-24-08 9.00 10.90 1.90 1.1
PD-24-09 4.73 6.56 1.83 2.9
Including 5.15 5.60 0.45 11.1
PD-24-10A 10.00 12.24 2.24 3.2
Including 10.98 11.44 0.46 11.4
PD-24-11 12.19 13.30 1.11 0.3
PD-24-12 9.25 11.25 2.00 3.1
Including 9.75 10.25 0.50 10.6
PD-24-13 9.74 11.28 1.54 1.3
Including 9.74 10.26 0.52 2.8
PD-24-14 11.87 13.74 1.87 0.3
PD-24-15 11.17 13.00 1.83 0.5
PD-24-16 10.30 12.37 2.07 0.6
Including 11.86 12.37 0.51 1.4
PD-24-17 10.15 13.32 3.17 3.5
Including 10.15 10.65 0.50 11.9
And including 12.82 13.32 0.50 6.7
PD-24-18 10.50 11.72 1.22 1.6
Including 10.89 11.22 0.33 4.5
PD-24-19 15.83 16.75 0.92 2.6
Including 16.28 16.75 0.47 4.7
PD-24-20 7.79 9.45 1.66 1.2
PD-24-21 Zone Absent
PD-24-22 12.93 14.31 1.38 1.4
PD-24-23 8.75 10.25 1.50 0.5
PD-24-24 6.70 8.27 1.57 0.3
PD-24-25 7.58 9.25 1.67 1.0
PD-24-26 6.00 8.43 2.43 0.7
PD-24-27 7.10 7.50 0.40 0.2
PD-24-28 7.89 9.38 1.49 0.9
Including 8.36 8.68 0.32 2.0
PD-24-29 6.23 7.06 0.83 3.9
PD-24-30 8.52 9.45 0.93 0.2
PD-24-31 7.34 9.00 1.66 1.6
Including 7.34 7.75 0.41 4.6
PD-24-32 7.17 8.42 1.25 1.1
PD-24-33 7.25 8.24 0.99 0.9
PD-24-34 7.70 8.68 0.98 0.3
PD-24-35 9.90 10.50 0.60 0.3
PD-24-37 10.63 12.46 1.83 0.9
Including 12.00 12.46 0.46 2.2
PD-24-38 10.05 11.50 1.45 0.9
Including 11.00 11.50 0.50 1.6
PD-24-39 9.72 12.16 2.44 0.8
Including 11.33 12.16 0.83 1.8
PD-24-40 4.17 7.42 3.25 0.3
PD-24-41 10.11 12.04 1.93 1.2
Including 10.61 11.11 0.50 4.0
PD-24-42 14.55 15.45 0.90 0.3
PD-24-43 13.19 14.39 1.20 1.2
Including 13.69 14.05 0.36 3.7
PD-24-44 14.66 16.26 1.60 0.5
PD-24-45 12.14 14.13 1.99 1.6
Including 13.73 14.13 0.40 6.9
PD-24-46 11.50 13.10 1.60 1.1
Including 11.50 11.85 0.35 3.3
PD-24-47 0 1.80 1.80 0.3
PD-24-48 0 1.45 1.45 1.7
Including 0 0.50 0.50 3.2
PD-24-49 0.84 3.21 2.37 0.1
PD-24-50 0 1.25 1.25 0.6
PD-24-51 5.47 6.84 1.37 0.6
PD-24-52 0 2.66 2.66 0.3
PD-24-53 0.50 2.46 1.96 1.6
Including 1.50 2.46 0.96 2.9
Including 1.50 1.96 0.46 5.0
PD-24-54 1.17 2.68 1.51 1.2
Including 1.68 2.17 0.49 3.0
PD-24-55 9.08 11.17 2.09 2.1
Including 9.51 10.44 0.93 4.2
PD-24-56 Incomplete
PD-24-57 12.07 13.05 0.98 1.0
PD-24-59 Zone Absent
PD-24-60 8.69 10.40 1.71 2.4
Including 10.05 10.40 0.35 6.8
PD-24-61 Zone Absent
PD-24-62 8.70 9.21 0.51 0.1
PD-24-64 Structural Zone
PD-24-65 4.08 5.28 1.20 0.4
PD-24-67 9.80 11.30 1.50 0.1
PD-24-68 11.05 12.50 1.45 0.3
PD-24-69 16.00 17.50 1.50 3.6
Including 16.50 17.00 0.50 6.4
PD-24-70 15.00 16.39 1.39 3.4
Including 15.51 16.39 0.88 5.4
Including 15.93 16.39 0.46 6.8
PD-24-71 14.42 15.65 1.23 2.1
Including 15.21 15.65 0.44 4.8
PD-24-72A 13.89 15.88 1.99 1.2
Including 14.88 15.38 0.50 2.1
PD-24-75 9.37 11.38 2.01 0.6
PD-24-76 8.62 10.34 1.72 2.6
Including 9.56 10.00 0.44 7.4
PD-24-77 4.20 6.12 1.92 0.6
Including 4.20 4.70 0.50 1.6
PD-24-78 6.45 9.70 3.25 1.6
Including 8.28 9.70 1.42 3.1
Including 8.28 8.74 0.46 6.7
PD-24-79 9.69 11.55 1.86 1.5
Including 10.07 10.50 0.43 4.4
PD-24-80 7.75 9.55 1.80 0.8
PD-24-81 7.00 8.91 1.91 1.3
Including 8.00 8.51 0.51 3.5
PD-24-82 7.12 9.59 2.47 0.5
PD-24-83 3.62 5.44 1.82 1.6
Including 4.56 4.94 0.38 6.3
PD-24-84 10.25 11.74 1.49 1.9
Including 10.72 11.23 0.51 4.7
PD-24-85 7.79 10.27 2.48 2.0
Including 9.79 10.27 0.48 3.4
PD-24-86 8.60 8.93 0.33 0.3

1Interval width is approximate true thickness. Mineralization has a flat to 5-degree dip and all holes were drilled vertically with an inclination of -90 degrees.

Table 2. Details of drill hole locations reported in this press release.

Drill Hole Inclination
(Degrees)
Length
(metres)
Easting (UTM) Northing (UTM)
PD-24-01 -90 12 556364 5183346
PD-24-02 -90 12 556363 5183375
PD-24-03 -90 12 556365 5183314
PD-24-04 -90 15 556334 5183314
PD-24-05 -90 15 556335 5183345
PD-24-06 -90 15 556336 5183375
PD-24-07 -90 12 556363 5183405
PD-24-08 -90 15 556336 5183404
PD-24-09 -90 12 556365 5183283
PD-24-10A -90 15 556334 5183283
PD-24-11 -90 18 556164 5183320
PD-24-12 -90 16.5 556149 5183320
PD-24-13 -90 16.5 556148 5183335
PD-24-14 -90 15 556134 5183346
PD-24-15 -90 15 556134 5183360
PD-24-16 -90 15 556149 5183360
PD-24-17 -90 16.5 556174 5183361
PD-24-18 -90 18 556190 5183361
PD-24-19 -90 18 556189 5183346
PD-24-20 -90 16.5 556190 5183376
PD-24-21 -90 13.5 556149 5183290
PD-24-22 -90 16.5 556149 5183263
PD-24-23 -90 10.5 556118 5183267
PD-24-24 -90 10.5 556171 5183040
PD-24-25 -90 10.5 556187 5183040
PD-24-26 -90 10.5 556187 5183025
PD-24-27 -90 10.5 556171 5183055
PD-24-28 -90 10.5 556187 5183055
PD-24-29 -90 10.5 556171 5183070
PD-24-30 -90 10.5 556187 5183070
PD-24-31 -90 10.5 556185 5183011
PD-24-32 -90 10.5 556201 5183040
PD-24-33 -90 10.5 556201 5183055
PD-24-34 -90 10.5 556201 5183070
PD-24-35 -90 15 556183 5183433
PD-24-37 -90 15 556183 5183417
PD-24-38 -90 15 556199 5183417
PD-24-39 -90 16.5 556169 5183397
PD-24-40 -90 18 556224 5183361
PD-24-41 -90 15 556225 5183391
PD-24-42 -90 18 556177 5183238
PD-24-43 -90 15 556165 5183189
PD-24-44 -90 18 556174 5183214
PD-24-45 -90 16.5 556146 5183215
PD-24-46 -90 15 556202 5183213
PD-24-47 -90 10.5 556419 5183459
PD-24-48 -90 10.5 556402 5183459
PD-24-49 -90 7.5 556411 5183445
PD-24-50 -90 9 556395 5183445
PD-24-51 -90 10.5 556380 5183445
PD-24-52 -90 12 556418 5183472
PD-24-53 -90 10.5 556402 5183473
PD-24-54 -90 10.5 556386 5183460
PD-24-55 -90 15 556195 5183160
PD-24-56 -90 12 556136 5183160
PD-24-57 -90 15 556165 5183160
PD-24-59 -90 12 556159 5183116
PD-24-60 -90 12 556192 5183116
PD-24-61 -90 13.5 556219 5183115
PD-24-62 -90 12 556219 5183090
PD-24-64 -90 15 556233 5183242
PD-24-65 -90 15 556233 5183213
PD-24-67 -90 15 556132 5183319
PD-24-68 -90 15 556134 5183333
PD-24-69 -90 21 556196 5183315
PD-24-70 -90 19.5 556191 5183331
PD-24-71 -90 18 556180 5183324
PD-24-72A -90 18 556177 5183336
PD-24-75 -90 15 556309 5183376
PD-24-76 -90 15 556308 5183345
PD-24-77 -90 12 556365 5183361
PD-24-78 -90 13.5 556350 5183361
PD-24-79 -90 13.5 556335 5183361
PD-24-80 -90 13.5 556350 5183313
PD-24-81 -90 13.5 556350 5183329
PD-24-82 -90 13.5 556350 5183346
PD-24-83 -90 12 556364 5183329
PD-24-84 -90 13.5 556334 5183329
PD-24-85 -90 13.5 556335 5183433
PD-24-86 -90 12 556363 5183433

Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/401e39bd-feb9-4f3c-b9bb-ea1d9c1ca293

https://www.globenewswire.com/NewsRoom/AttachmentNg/884e4461-0975-4f51-bfa9-3063045cf5de

https://www.globenewswire.com/NewsRoom/AttachmentNg/b743d5c5-ce82-4e21-9c3d-4738c4829549


Primary Logo

Figure 1. Plan map illustrating gold grade (gpt Au) of the approximately 2-metre-thick gold-bearing reef at the Pardo Gold Project.

Figure 1. Plan map illustrating gold grade (gpt Au) of the approximately 2-metre-thick gold-bearing reef at the Pardo Gold Project.
Figure 2. Plan map illustrating the area of currently drilled gold mineralization and the regional extent of the targeted host geology open for expansion.

Figure 2. Plan map illustrating the area of currently drilled gold mineralization and the regional extent of the targeted host geology open for expansion.
Figure 3. Plan map illustrating permitted bulk sample location and gold grade (gpt Au) of the approximately 2-metre-thick gold-bearing reef at the Pardo Gold Project.

Figure 3. Plan map illustrating permitted bulk sample location and gold grade (gpt Au) of the approximately 2-metre-thick gold-bearing reef at the Pardo Gold Project.
Powered by EIN News

Distribution channels: Media, Advertising & PR

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Submit your press release